Contact us: 800-411-6313 • information@firetrain.com
Please click on a reference for more details. HTL is currently working on new fire training facilities in several states. Also, be sure to use the search function on the left for more detailed searches.
System 203 thermal tile linings are being installed in this new Fire Training Center burn building, replacing a 22 year old structure.
HTL assisted this Department in planning and executing the renovation of their existing live fire training structure. HTL then installed System 203/System 203 Lite after the structure had been repaire
System 203 was installed in two corners of this existing training structure.
Palm Beach State’s Fire Academy has the most complete array of fire rescue apparatus, equipment and training facilities in the area. The newly completed Fire Training Tower is the most advanced
HTL provided design consultation for this project and also installed System 203 in two burn rooms. Additional System 203 linings were installed in 2008.
HTL was the prime contractor on this major renovation project that included gutting two structures by removing all structural slabs, casting new slabs in place and lining the structure with System 203
System 203 was installed on a ceiling in this renovated training structure.
This is a new Class A Live Fire Training Structure, located on an approximately 20 acre site Read More
2018 – This is a new Class A Live Fire Training Tower. It is a six-story training tower l Read More
© 2017 - E. H. Glover Inc. - High Temperature Linings | All Rights Reserved | 800-411-6313 | information@firetrain.com