Project Info:
System 203 was installed in two rooms of an existing training facility requiring considerable structural repairs and alterations.
In 2003 four burn rooms were fully lined with System 203 in a new training structure.
In 2009 we added linings to an existing structure.
- Contact Name: Div. Chief Keith Swindle
- Contact Number: 410-222-8361
- Contact Address: Millersville, Maryland, U.S.A.
- State: Maryland
- Country: U.S.A
- Year Installed: 1996
- Contractor: GOEL Services, 6211 Dix Street NE, Washington, DC 20019 Mr. John Mulhern, (202) 457-0111 ext 629
john.mulhern@8a.com