Protective Lining / System 203

Installation Process : Ceiling

Generally, the ceiling is the first to be lined in a burn room. A 1" thick insulation panel is attached directly to the ceiling and then completely encapsulated by System 203's unique interlocking castings. This system protects the structure from water, heat and thermal shock.

Shown here is a partially completed ceiling with the insulation panel still exposed.

HTL employees install System 203 on the ceiling of a burn room.